• School Closings/Delays:

    Dear Parents, 

    We have done our best to remain open in the face of mounting illnesses of staff and students. Some schools are doing better than others, however. 

    At this time, we will have to close Story Creek, beginning this Wednesday (1/19/22) through next Monday (1/24/22). Story Creek will reopen next Tuesday, 1/25/22. 

    We realize this is short notice, but we did not have much leeway. Our goal has been to allow for a two-day notice to parents, but that was not possible in this situation. 

    Thank you for your patience and understanding. 

    Godfrey Saunders 

Close alert

Scope of Work High School Auditorium Air Conditioning Install

Last Updated: 9/15/2021 1:45 PM

Jay Bates
District Clerk
jbates@bsd44.org
406-924-2031

Download/Print a copy for personal use.

Scope of Work Details:

Our District is in need of having two packaged HVAC units installed in our High School Auditorium.

The two existing units will require removal and disposal. The two new units will be packaged systems with air conditioning, gas heat and electric heat back-up. The two new units will rooftop mounted and will require a crane service for installation. The two new locations on roof will require engineering approval for weight load etc. Sizing of both systems will be the responsibility of the contractor. The Auditorium will also require two mini split systems to cool our audio and lighting equipment.

 

Pre-bid walk throughs are available.

 

Estimated Job Cost: $

 

School Site
High School Auditorium
Project Lead/Contact Number: LeRoy @ 406-579-9416
Cost Proposals needed ASAP
Project Deadline: Summer 2020
Project Name: Auditorium Air Conditioning Install

 

Companies that have not worked for Belgrade School District 44 must provide a W9.  Quotes may be sent by email to llundell@bsd44.org   A purchase order number must be provided by BSD44 before commencement of any work.  For a walk through please contact LeRoy @ 406-579-9416